您的浏览器版本过低,为保证更佳的浏览体验,请点击更新高版本浏览器

以后再说X

News

Busduct plug-in box introduction

Reading volume:408 Release time:2023-09-08 10:01:41

Busduct plug-in box introduction

Before installing the busduct plug-in box, the safety baffle at the busduct plug hole should be opened. The switch inside the box should be pushed to the OFF position first, and the pins of the plug-in box should be inserted into the busduct from the busduct plug hole in phase sequence, ensuring that they are inserted in place. Do not plug or unplug with power. After the installation of the plug-in box, the front and rear claw type clamps should be fixed on both sides of the busduct and the screws should be tightened. When vertically installing a plug-in box with a large switch inside, a load-bearing bracket should be installed at the bottom; When installing horizontally, load-bearing clamps should be added. The starting box of the busduct is the incoming box for inserting the busduct. It is a busduct insertion inlet box installed at the starting point of the power supply inlet at the beginning of the busduct insertion.

The busduct can be divided into feeder and plug-in feeder. As a new type of distribution wire, plug-in busduct has emerged, which fully demonstrates its advantages in high current transmission compared to traditional cables. At the same time, the tempering furnace adopts new technologies and processes, greatly reducing the contact resistance and temperature rise at the connection points at both ends of the busduct and the insertion points at the branching ports, and using high-quality insulation materials in the busduct, This improves the safety and reliability of the busduct, making the entire system more complete.


News

Contact Us

Contact:Mr.Jasper Liu


WhatsApp:+86 15205288168


Tel:+86-511-88136688


Email:salesmegachina@optimus-busduct.com(Click on email to inquire about quotation)


Address:No 3,Yuanbo Avenue,Economic development zone,Yangzhong City,Jiangsu Province,China